Modular Sukkah Instructions

page 2 of 2

back to page 1

3. CORNER ASSEMBLY

Hook female side of corner section into male side of panel then swing in the direction of arrow shown in diagram.

NOTE: The next panel is assembled to the male side of the corner in a similar fashion.

Modular Sukkah Instructions

4. ASSEMBLY OF LAST CORNER

(This step is for a four sided sukkah only.)

On a 4 sided sukkah one corner must be left for last. The last corner will use the 2 short corner sections to join the last two panels together. These 2 short corner sections must be slid in place, (instead of hooked) starting at the top and sliding down.

NOTE: You may need a step ladder to see that you are sliding the corner section in properly.

Modular Sukkah Instructions

5. TOP REINFORCING WOOD BAR INSTALLATION

On Sukkahs larger than 8ft. x 8ft. Special Top Brace "S" Clamp Brackets give the walls greater rigidity and stability. Slide wood bars into position as shown in the illustration. 

Modular Sukkah Instructions

5. TOP OF SUKKAH WOOD BEAM ASSEMBLY

Place the pre-notched lumber beams on the top of the Sukkah as shown in the illustration. Now you can place the "schach" tree branches, bamboo mat, or bamboo poles on top.

Modular Sukkah Instructions

FOR SUKKAHS WITH ONLY 3 WALLS

Attach the (2) Wall Support Brackets to the wall with screws. This can be a permanent installation. Slide Sukkah panel into bracket as shown in illustration.

Modular Sukkah Instructions

Back to Modular Sukkahs

Back to instructions

Welcome to Sukkahs.com Your one stop sukkah shop

Home  Canvas Sukkahs  Quick Fit Sukkahs  Modular Sukkahs  Portable Sukkahs  Schach

Order Form  Prices  Shipping  Instructions  Learn About  Contact  Parts & Stuff  Links  Privacy